Be In The Know

rss logo RSS Feed
Buying | 65 Posts
Real Estate News | 43 Posts
Selling | 45 Posts
October
13

A condo loan can fail because of the building, even when the buyer's own file is perfect. The lender is not only lending against one unit. It is lending against an association that owns the roof, the structure and the reserve account, and it wants to see that association in good shape before it funds anything.

That surprises many people shopping for condos and townhouses for sale in Rockford. You can have the credit, the down payment and a signed contract, and still hit a wall because the project has too many owners behind on dues or a lawsuit about the foundation. This guide explains what the two biggest loan programs actually check, using Fannie Mae's Selling Guide and HUD's FHA pages as we read them in October 2026. We also cover what Illinois law lets you ask the association to hand over.

Why Lenders Review The Building, Not Just The Buyer

A house loan rests on one structure and one lot. A condo loan rests on that unit plus a share of everything the owners hold in common. If the association runs out of money, or the building needs a repair nobody saved for, every unit in it loses value together. The lender and the investor who buys the loan on the secondary market both know this. So they review the project as well as the borrower.

Fannie Mae buys and securitizes conventional mortgages, and its Selling Guide sets the project rules lenders follow when they sell loans to it. The lender uses Fannie Mae's web tool, called Condo Project Manager, and certifies that the project meets the published requirements. The Guide is plain about where the responsibility sits. The certification rests on the data the lender enters, and the lender must review the project documents to get that data right.

The result of that review shows up as a status. The Guide lists several. A project can be certified by the lender, approved by Fannie Mae directly, conditionally approved, or marked incomplete while paperwork is missing. It can also be marked "Guide Ineligible" based on the facts the lender entered, or "Unavailable," which the Guide defines as a project Fannie Mae has determined to be ineligible. Loans for units in an Unavailable project cannot be sold to Fannie Mae. For a buyer, that is the status that ends a deal.

Some of the Full Review tests are numbers, and they are worth knowing because they tell you what the association's books have to look like:

  • No more than 15 percent of the units in the project may be 60 days or more past due on common expense assessments. The Guide's own example is a 100-unit project, which may not have more than 15 units that far behind.
  • No more than 15 percent of the units may be 60 days or more past due on any special assessment.
  • The annual budget must set aside at least 10 percent for replacement reserves, or a reserve study must show that the funded reserves protect the project to an equivalent standard.
  • The project must sit on contiguous parcels of land, though public or private streets may divide it.
  • The developer may not keep an ownership interest in the facilities, and amenities may not be subject to a lease between the owners or the association and another party.

Look at what those tests have in common. None of them asks anything about the unit you are buying. A freshly updated kitchen does nothing for the 15 percent delinquency test. This is also why two identical-looking units in two different buildings can have very different financing options. One association keeps its dues current and funds its reserve. The other lets both slip. The unit does not change. The project does.

Timing matters too. The Guide says a Full Review for an established project must have been completed within one year before the note date, and a review for a new project within 180 days. A review that was good last spring can be stale by closing. Your lender may need to refresh it before closing.

What Makes A Project Ineligible

The Guide has a whole topic called Ineligible Projects, and it is worth reading once because the list is concrete. A project with any of these characteristics is out for Fannie Mae no matter how healthy the unit looks.

Some of the entries are structural. Timeshare, fractional and segmented ownership projects are ineligible. So are projects run as a hotel or motel, even though the units are individually owned. The Guide describes the signs in detail. An association licensed as a hotel is one. Rental pooling that requires owners to hand units over to a rental program is another. A project that offers daily cleaning, registration desks or short-term rentals falls on the wrong side of the line, and so does one with a name that contains hotel, motel or resort unless that word refers only to the building's history. The Guide also tells lenders to look harder when 75 percent or more of the units are investment or second homes, or when the units are under 400 square feet.

Some entries are about money and legal exposure. A project is ineligible if the association is named in pending litigation that relates to safety, structural soundness, habitability or the functional use of the project. The Guide allows exceptions for minor matters. A neighbor dispute is minor. So is a claim the insurance carrier has agreed to defend and cover, or a suit where the expected damages and legal costs are not more than 10 percent of the funded reserves. Construction defect suits where the association is the plaintiff are generally not treated as minor. The lender has to document its reasoning either way.

Physical condition gets its own category. The Guide calls it "projects in need of critical repairs" and defines it as repairs or replacements that significantly affect the safety, soundness, structural integrity or habitability of the buildings, or the financial viability of the project. The examples include material deficiencies that could cause a critical system to fail within one year, water intrusion or damaging leaks, advanced physical deterioration, and a failed mandatory structural inspection. Unfunded repairs costing more than ten thousand dollars per unit that should happen within 12 months also qualify. A project under an evacuation order is ineligible until the unsafe condition is fixed and the buildings are deemed safe.

Special assessments sit inside this rule. If the association has approved one, the lender has to find out its purpose, how much remains to be collected and when it will be paid off. A special assessment tied to a critical repair that has not been remediated makes the project ineligible. A special assessment for routine work does not.

A few more entries are worth a quick mention:

  • A single entity owning more than 20 percent of the units in a project of 21 or more units. For projects of 11 to 20 units the limit is two units.
  • Non-residential or commercial space above 35 percent of the total.
  • Projects where one owner can hold more than one unit under a single deed and a single mortgage.
  • Projects that are terminating, or are in bankruptcy, receivership or a similar insolvency proceeding.

The single-entity rule matters in smaller buildings. In a 12-unit building, one investor holding three units can block Fannie Mae financing for every buyer after them, even if the building is spotless. The Guide does permit a waiver in one case. A purchase that lowers the concentration may be approved if the single entity owns no more than 49 percent of the units, is current on assessments, is actively marketing units for sale, and there are no pending special assessments. That is a narrow door, and your lender has to be the one to open it.

FHA works from its own set of rules. HUD's FHA condominium page says FHA insures condo loans for terms up to 30 years, either in an FHA-approved project or in a project that is not approved but meets the Single-Unit Approval requirements. FHA's published handbook lists ineligible characteristics of its own. These include cooperative ownership, condo hotels, mandatory rental pooling, timeshares, projects with more than one dwelling per condo unit, and continuing care facilities. The handbook text we read was issued with HUD's 2019 condo rule, so the numbers below are from that document. HUD updates its guidance from time to time, and the current handbook is the version your lender must follow.

In that handbook, an existing project generally needs at least 50 percent of its units owner-occupied. A narrow exception allows at least 35 percent for projects more than 12 months old, if no more than 10 percent of units are in arrears. The handbook asks for a reserve funded at 10 percent of aggregate monthly assessments, no more than 15 percent of units in arrears, and liability coverage of at least one million dollars per occurrence. It also limits how much of a project one owner can hold. For projects of 20 or more units, that is 10 percent or less.

The Single-Unit Approval route matters to buyers of units in buildings that are not on the FHA-approved list. HUD's page says a unit can qualify if the project is not FHA-approved, is complete and ready for occupancy, has at least five dwelling units, and is not a manufactured home. The project must also meet a subset of the approval requirements, including FHA insurance concentration, owner-occupancy percentage and the financial condition of the project. So the route exists, but it is not a loophole. The building still has to pass a test.

What To Ask The Association Before You Make An Offer

You do not have to wait for your lender to find the problem. Illinois law already gives you a path to the same documents. Section 22.1 of the Illinois Condominium Property Act covers resales by an owner other than the developer. It says the selling owner must obtain a package from the Board of Managers and make it available for inspection to the prospective buyer on demand.

The statute lists what goes in that package. Read the list as a checklist, because it lines up closely with what a lender is going to test:

  • The declaration, bylaws, other condominium instruments and any rules and regulations.
  • A statement of liens, including the unit's account showing unpaid assessments and other charges.
  • A statement of capital expenditures the association expects within the current or next two fiscal years.
  • The status and amount of the reserve for replacement fund, and any part of it earmarked for a specific project.
  • The association's statement of financial condition for the last fiscal year available.
  • The status of any pending suits or judgments involving the association.
  • A statement of the insurance the association carries for all owners.
  • A statement that improvements or alterations made to the unit by the prior owner are believed in good faith to comply with the condominium instruments.
  • The name and mailing address of the principal officer, or of the person designated to receive notices.

The statute text we read also lists a copy of the association's collection policy as a tenth item, in the text printed as amended by Public Act 104-734. The statute page prints two versions of Section 22.1, one before that amendment and one after, so ask for the collection policy regardless. It is useful, and no board has a good reason to refuse it.

The request is made in writing, and the principal officer or the designated officer must furnish the information within 10 business days of the request. The association may charge the seller a reasonable fee for this. The statute caps it at 375 dollars, adjusted each year by a consumer price index percentage, and permits an extra 100 dollars for rush service completed within 72 hours. Those are the seller's costs, not yours. But the timing is yours to manage. Ten business days is two calendar weeks. If you ask on the day the contract is signed, the documents may arrive after your attorney review and inspection windows are already running.

Here is how this plays out in practice. Say a buyer is under contract on a unit in a 12-unit building and the lender asks for the budget and a delinquency report. The budget shows no line for reserves. The statement of liens shows the seller's account is current, which looks fine, but nobody has checked the other eleven units. The buyer reads the pending-suits statement and finds the association is named in a suit over water damage to the garage structure. Three separate problems show up in one packet. Any one of them could stall a Fannie Mae loan, and the buyer saw them before the closing date rather than the week of it. That is the value of asking early.

When you read the package, pay attention to these points:

  • Reserves. A budget with no reserve line, or a reserve far below what the Guide's 10 percent test would require, tells you the association is likely to rely on special assessments. Ask what repairs the board expects in the next two years.
  • Delinquencies. Ask for the number of units behind on dues and for how long. The 15 percent line applies to units 60 days or more past due.
  • Litigation. If there is a suit, ask what it is about. A dispute over a parking space is a different thing from a structural defect claim.
  • Insurance. Ask what the master policy covers and what the deductible is. Both Fannie Mae and FHA have insurance standards, and the lender checks them separately.
  • Investor concentration. Ask how many units are rented and whether any one owner holds several.

One last point is easy to miss. The Fannie Mae and FHA rules above apply to loans sold to or insured by those programs. If a project fails them, ask your lender what other loan types it offers for that building and get the answer in writing before you rely on it.

Bottom Line

Condo financing is a test of the building first and the buyer second. Fannie Mae's published rules check delinquency, reserves, litigation, physical condition and ownership concentration. FHA checks many of the same things on its own terms. Before you fall for a unit, request the Illinois resale package and read the budget, the delinquency count, the pending suits and the insurance statement. If you are comparing condos and townhouses for sale in Rockford, ask your lender early whether the project is approved or can be reviewed, because the answer decides which loan you can use. For the costs that come after the loan is settled, see our guide to transfer taxes and closing costs in Rockford, and for the loan programs themselves, Rockford first-time buyer programs. Your lender and your attorney confirm what applies to your file.

Those are the main points. Here are the questions that come up most once a buyer starts reading a condo package.

Frequently Asked Questions

Why can a lender refuse a condo loan when my own credit and down payment are fine?

Because the loan is secured by a unit and a share of the whole project. Fannie Mae's Selling Guide requires the lender to review the project and bars loans in projects with certain characteristics, such as a high share of units behind on dues, pending litigation over structural or safety issues, or critical repairs that are not funded. A project can be marked Unavailable, and loans in an Unavailable project cannot be sold to Fannie Mae. The unit and the buyer can be fine while the project fails.

What percentage of owners behind on dues is too many for Fannie Mae?

For a Full Review, the Selling Guide says no more than 15 percent of the units may be 60 days or more past due on common expense assessments. The same 15 percent limit applies to each special assessment. The Guide's example is a 100-unit project, which may not have more than 15 units that far behind. Late fees and similar charges are a separate matter, so ask the association for the actual delinquency count rather than guessing.

Does a special assessment make a condo ineligible?

Not by itself. The Selling Guide tells lenders to find out what the special assessment is for, when it was approved, how much remains and when it will be paid off. If it is tied to a critical repair that has not been fixed, the project is ineligible. A special assessment for routine work does not trigger that rule. Ask the association for the board minutes and the assessment schedule so your lender can answer the question.

What documents can I ask the seller to get from the condo association in Illinois?

Section 22.1 of the Illinois Condominium Property Act lists them. They include the declaration, bylaws and rules, a statement of liens and unpaid assessments on the unit, expected capital expenditures, the status of the reserve fund, the latest financial statement, pending suits, insurance coverage, and the principal officer's contact details. The officer must furnish the package within 10 business days of a written request, so ask early in the contract period.

How does FHA treat a condo that is not on the FHA-approved list?

HUD says FHA can insure a loan on a unit in a project that is not FHA-approved if it meets Single-Unit Approval requirements. The project must be complete and ready for occupancy, have at least five dwelling units, and not be a manufactured home. It must also meet a subset of the approval requirements, including FHA insurance concentration, owner-occupancy percentage and financial condition. Your lender determines whether a specific building qualifies.

What owner-occupancy level does FHA look for in an existing condo project?

The FHA handbook text we read, issued with HUD's 2019 condo rule, says at least 50 percent of the units for existing construction. It also allowed an exception of at least 35 percent for projects more than 12 months old if no more than 10 percent of the units were in arrears. HUD revises its handbook, so ask your lender to confirm the current figure for the project you are considering.

Can an investor owning several units in a building affect my loan?

Yes. Under Fannie Mae's Selling Guide, a single entity owning more than 20 percent of the units in a project of 21 or more units makes it ineligible, and for projects of 11 to 20 units the limit is two units. FHA's handbook sets its own limit on individual owner concentration. Ask the association how many units each owner holds and how many are rented before you go under contract.

Login to My Homefinder