Be In The Know

rss logo RSS Feed
Buying | 65 Posts
Real Estate News | 43 Posts
Selling | 45 Posts
October
13

Four named organizations keep a South Beloit house running. Illinois American Water supplies the water, the City of South Beloit bills for sewer and puts the garbage fee on that same bill, Rock River Disposal hauls the trash, and Rock Energy Cooperative is the electric and gas company the city lists.

If you are weighing homes for sale in South Beloit, this guide sorts out who bills what, what the city's own code says about sewer, garbage and closings, and which rules land on the owner of the house. Gambino Realtors has been in business since 1923, and the points below come from the City of South Beloit's own pages and code of ordinances, the providers' pages and the Illinois EPA.

Who Provides What In South Beloit

The City of South Beloit runs its sewer service out of a wastewater department at 100 Perry Avenue, open Monday through Friday from 7:00 a.m. to 3:30 p.m. The same department's page carries a short utilities box. It names Illinois American Water as the water utility, with a customer line of 800-422-2782, and Rock Energy Co-Op as the electric and gas utility, with a number of 608-752-4550. The city's page lists the water utility separately from its own sewer service, so water and sewer are two different accounts.

Illinois American Water's page for new customers describes a MyWater account that lets you view and pay a bill, turn water service on and off, and track usage history. Its customer service line is 1-800-422-2782, and the page gives the hours as Monday through Friday, 7 a.m. to 7 p.m. For an emergency the page says the company is available 24 hours a day.

The two accounts are linked, even though two different bills arrive. The city's code says the sewer charge is based on water usage as recorded by water meters. It also says that when a metered customer's sewer bill goes unpaid, the city notifies Illinois American Water to order termination of water service. So a sewer bill left alone can end in a water shutoff, and the water company is the one that carries it out. The code adds one more connection. When the city adjusts a sewer bill after a major leak, it states that any adjustment to the amount due to Illinois American Water is at that company's discretion.

For electric and natural gas, the cooperative's Moving into Our Area page asks you to fill out a Start Service form. A member service representative then calls or emails to complete the request. The form asks whether the service is new construction or an existing service, and whether the home is occupied by an owner or a tenant. For questions, the page gives 866-752-4550, answered between 7:30 a.m. and 4 p.m. on weekdays. The cooperative's home page lists its headquarters at 2815 Kennedy Road in Janesville, Wisconsin, and a South location at 15229 Willowbrook Road in South Beloit, Illinois 61080.

Its page for stopping or changing service has a separate instruction for emergencies. It says not to use the form to report an outage, because the email account is not monitored around the clock. If you have an outage or smell gas, the page says to call (608) 752-4550 or (866) 752-4550, and that the cooperative responds 24 hours a day. The cooperative's assistance menu lists both an Illinois and a Wisconsin energy assistance program page.

Natural gas has its own process for starting or restarting service, and the cooperative's natural gas service page describes two cases. For a new installation, the cooperative's valve starts locked and closed. A plumber, HVAC contractor or other qualified person must make the connection between the owner's piping and the member valve. Once code requirements are met, a pressure test is completed and a Gas Piping Statement is received, and then the cooperative performs an onsite creep test. For gas turned on at an existing service, the member fills out a Disclosure Statement for the Reconnection of Natural Gas Meters, and a creep test follows. In both cases, if the piping fails the creep test on the first trip, or violates plumbing codes, the page says the gas meter stop is left locked and closed until the piping issues are resolved through the Winnebago County Plumbing Inspector, at 815-987-3090. A second visit from the cooperative carries a trip charge.

Garbage is the fourth name on the list. Rock River Disposal's website has a page for the City of South Beloit and a customer phone line of 815-965-2489. The city clerk's page links to the company for garbage and recycling information. The details of the service, and what the city's code adds to them, are in the next section.

Two city departments handle the street in front of the house. The Streets and Parks Department is at 851 Doner Drive, with an office line of 815-389-4448. Its listed duties include street sweeping, catch basin maintenance, snow plowing and removal, alley grading, pavement repair, street signs and mowing city property. The snow emergency rule on that page says that when snowfall has accumulated to one inch or produces hazardous conditions, a snow emergency is declared and owners must remove vehicles parked on the roadway immediately. To report a stormwater problem, the city's Public Works page gives 815-389-3070.

The City's Sewer Bill, With The Garbage Fee On It

Sewer is the service the city provides itself, and its code puts the rules on the property owner. Under the city code, every application for sewer service is made by the owner of the premises, and every premises served is its own account in the property owner's name. All sewer bills are sent to the property owner. The code goes further. It says the owner and all successors in title are deemed to be the applicant and customer for all sewer service provided to the property, whether or not that owner is the end user and whether or not that owner signed the application.

That wording matters to a buyer. When a property with established sewer service changes hands, the code says an application for sewer service is made at the city clerk's office, and the owner of the property signs it. The city's Sewer Service Application asks for the owner's name, service address, billing address and a witnessed signature, and a section for office use records the parcel identification number, any lien and any previous unpaid balances.

The form carries one more sentence that deserves a slow read. The city accepts no liability for damage that results from the area being flooded by the stoppage or back flow of sewers, and the building shall be provided with a back flow or sanitary check valve by the owner, with maintenance of that valve the owner's responsibility. A separate tip on the city's wastewater page tells owners that sewer backup damage may not automatically be covered by a homeowners or renters insurance policy. It says to ask your insurance agent whether you are covered for sewer backups, and that special endorsements can be added to a policy.

On timing, the code and the city's payment page give two different pictures, so check which one governs a given bill. Under the code, sewer bills go out by the twentieth day of the month after the period of service, and they are due and payable 21 days after being mailed. A penalty of ten percent is added to a bill not paid by its due date. The city's page on paying a sewer bill says the due date is 5 p.m. on the last business day of the month. The city lists payment online, by phone at 1-888-413-8240, by mail to City Hall at 519 Blackhawk Blvd., Suite 2, and in person or through the drop box at the same address.

The code spells out what an unpaid bill becomes. If a sewer bill is not paid within 21 days of being rendered, a delinquent notice goes to the property owner. After 21 days unpaid, the city clerk may send a notice of intent to file a lien. After more than 31 days, the clerk may file a statement of lien claim with the county recorder of deeds, naming the legal description of the premises and the amount owed. The code says the failure of the owner to receive the notice does not affect the city's right to foreclose the lien. A monthly bill that has stayed unpaid for 45 days can be sent to the city attorney to start a foreclosure of the lien. The city's sewer certification request form, covered below, shows whether a lien is on file.

Two relief provisions are written into the code. For financial hardship, the city clerk may enter an installment agreement that requires a down payment of 25 percent of the account balance. For catastrophic water loss, the customer submits a claim to a committee of the public works director, the city clerk and the finance director, and only one adjustment is allowed per customer.

Garbage is billed through the same system. Section 82-34 of the code says an application for sewer service to a residential unit is automatically considered an application for garbage collection service. Property owners who receive city garbage service and city sewer service are billed monthly, and the garbage fee appears on the monthly sewer bill. A two dollar and fifty cent administrative fee is charged on each bill, and a ten percent penalty is added to bills not paid by the due date. Residential properties not connected to city sewer are provided and billed for garbage collection automatically, with the bill sent to the owner shown on the latest real property tax bill, and ending sewer service to a residential unit also ends its garbage service.

The hauler's page for South Beloit describes what arrives at the curb. Every resident receives a 95 gallon trash container for unlimited curbside trash collection. Extra trash goes in cans or bags no larger than 32 gallons, each weighing no more than 50 pounds. Recycling is included with weekly service, with an 18 gallon recycle bin, collected on the same day as trash. Yard waste collection is a seasonal service running from April to November, and residents must sign up in advance before using it.

The city code supplies the rest of the rules, and some of its wording is older than the hauler's page. Collection from residential properties is made at least once each week, and the code defines a residential unit as a single-family dwelling, a multifamily dwelling of not more than three units, or a roominghouse. Refuse is set out by the property owner behind the curb and within five feet of the curb. It may go out no earlier than 6:00 p.m. on the day before collection and no later than 7:00 a.m. on collection day, and containers are to be returned to their original location by 6:00 p.m. on the day of collection. The code lists items the city will not collect, including dangerous materials, hot coals, construction and demolition debris, leaves and grass clippings, bulk refuse such as cardboard boxes, tree limbs and brush, and any bundle or container over 75 pounds. The container section still says containers hold between five and 20 gallons, while the hauler's page names a 95 gallon container. When the two differ, ask the city clerk or Rock River Disposal what applies at the address.

Section 82-35 puts the container rules in enforceable form. A first violation brings a warning letter. After that, the code sets charges of fifty dollars for a first offense, one hundred dollars for a second and three hundred dollars for a third and later offense, with the total of the charge and any city costs capped at seven hundred fifty dollars. Those charges are added to the city's sewer and garbage bill for the location. A person who receives a notice of violation may request a hearing within 30 days.

Closing On A South Beloit Home: The Sewer Certification And What You Own

The rule that belongs on every South Beloit buyer's list sits in the sewer article of the city code, and the city's forms put it into practice. Section 106-194 says no person shall sell, transfer or convey ownership of a building serviced by city sewer until a current certification of compliance with Chapter 106, Article III has been obtained by the property owner and deposited with the city. A sale that results in no new account being established or transferred is exempt. The certification is evidenced on a city form, completed and certified by an Illinois-licensed plumber, and it is not current after one year from the date it was signed.

The city's Clearwater Inspection Form shows exactly what that plumber is looking at. It is titled Account Transfer/New Account and cites Chapter 106, Article III. The plumber answers eight yes or no questions. Does a roof drain discharge to the sanitary sewer? Does a foundation drain? Does a storm or ground water sump pump? Does a combination storm and sanitary pump? Is there a diverter valve on the storm water sump pump discharge? Is there a sanitary sewer sump pit without a sealed bottom? Is there a flexible discharge hose on the storm or ground water sump pump? Are backflow preventers, such as sanitary check valves, installed? The form asks that it be submitted at least 10 days before closing, says it is not valid without a signature and complete plumber information, and says the certification is valid for one year from the date of inspection. For new construction, the form says all internal plumbing must be in place before certification.

The reason for those questions is stated in the code. Section 106-211 says no person shall discharge stormwater, surface water, groundwater, roof runoff or subsurface drainage to any sanitary sewer, and that this kind of water goes to storm sewers, combined sewers or an approved natural outlet. Section 106-188 separately bars connecting roof downspouts, exterior foundation drains or areaway drains to a building sewer that is connected to the public sanitary sewer. In plain terms, the inspection looks for clear water reaching the sanitary system through the house.

If the plumber's form shows noncompliance, the city notifies the owner and orders the building brought into compliance. The compliance period is 30 days where an illegal roof drain, foundation drain, sump pump or diverter valve is involved, and 60 days where clear water is entering through an under-the-basement-floor connection. The owner of a building found in violation must certify the fix before the sale, within that period. The code also keeps a sale from stalling. A buyer may deposit evidence of a contract or accepted bid for the work, evidence that adequate funds have been paid or escrowed, and a stipulation to finish within the compliance period. That evidence can be filed only after a certification form showing noncompliance has been deposited. If a new owner needs a certification within a year of a prior owner's filing and verifies that nothing has changed that would put the premises out of compliance, that verification satisfies the requirement.

Two limits are written into the same section. A certification reflects what an Illinois-licensed plumber could reasonably determine during a limited visual inspection, and the city assumes no liability for it. And anyone required to provide a certification bears the full cost and responsibility of selecting a licensed plumber to inspect the building. The code places that cost on the person required to provide the certification.

The second city form covers the money. The Sewer Certification Request Form is mailed or faxed to City Hall and asks for the owner of record, the new owner, the tentative closing date, the parcel identification number, and whether the property is vacant or occupied and residential or commercial. The form states that 10 days prior notice is required for release of information and that a ten dollar fee per account must accompany the request. The city fills in the current balance, the latest bill date, the amount billed, estimated charges through the closing date, and whether there is a lien. The fee lines include a sewer balance, a sewer certification fee and a lien release fee.

After closing, the line between the city's pipe and yours is also written down. Under Section 106-183, the owner pays for the building sewer, including its maintenance and repair. The owner's responsibility runs from the connection with the public sewer up to and including the building connection, and covers the portion in the public right-of-way. Maintenance includes rodding for blockage or root intrusion from private or public trees, and repairs for a collapsed pipe. Repairs to a defective sewer are due within ten days of written notice from the city. The city may repair a line in an emergency, in which case the owner pays the city within 30 days of an invoice unless the city council approves another arrangement. The city repairs the main sewer itself. The cost of cleanup on private property for a backup caused by the condition of the service line falls on the owner.

The code also covers the backflow device named on the application. For new construction connected to the city sewer after October 29, 2015, Section 106-195 requires a sewer backflow preventer, or sanitary sewer check valve. The owner pays for it, an Illinois-licensed plumber installs it, and the county plumbing inspector must inspect any installation on private property after the proper permit has been obtained. That section is written for new construction.

A South Beloit address does not always mean a city sewer. Section 106-68 says that where a public sanitary or combined sewer is located within ten feet of the property line, the owner of a building used for human occupancy must connect at the owner's expense within 90 days after official notice. Where a public sewer is not available, Section 106-69 allows a private sewage disposal system. A permit signed by the city clerk and superintendent comes first, no permit is issued for a system that does not meet the Winnebago County Health Code, Chapter 14, and the owner maintains it at no expense to the city. When a public sewer later becomes available, the building sewer must be connected within 90 days and the private system cleaned and filled. The Illinois EPA says septic systems are the homeowner's responsibility, should be inspected annually, and should be pumped every two to three years, with more frequent pumping where needed.

Bottom Line

A plumber's Clearwater certification has to be on file, it expires after a year, and the city asks for 10 days of notice both for that form and for the sewer certification request. Count back 10 days from the closing date for both. Then open the four accounts, water with Illinois American Water, sewer and garbage with the city, trash service with Rock River Disposal, and electric and gas with Rock Energy, and ask the city clerk at 815-389-3023 which due date your bill will carry.

When the paperwork is in order, the rest is a short list. Check the sump pump discharge and the downspouts, because those are what the plumber will write down. Ask about the gas, because inactive service has its own reconnection steps. Read the sewer backup language on the application, and ask your insurance agent about sewer backup coverage. For the tax side of ownership, see our guide to South Beloit property taxes and what is on your bill. To compare the same first-month questions in a neighboring village, read moving to Roscoe, and the full list of guides is in the Illinois Real Estate Guide. When you are ready to look at homes for sale in South Beloit, start with the listings.

Six quick answers follow, each drawn from the city's pages, its code and the providers' own sites.

Frequently Asked Questions

Who supplies water to a house in South Beloit?

The city's utilities box lists Illinois American Water as the water utility, with a phone number of 800-422-2782. The company's new-customer page describes a MyWater account for paying a bill and turning service on and off, and gives customer service hours of Monday through Friday, 7 a.m. to 7 p.m. The city bills sewer, and sewer is a separate account from water.

Does the city bill me for garbage?

Yes, for owners who receive city garbage service and city sewer service, the garbage fee appears on the monthly sewer bill. Section 82-34 of the city code says an application for sewer service is automatically an application for garbage collection, and a two dollar and fifty cent administrative fee and a ten percent late penalty apply. The hauler is Rock River Disposal, at 815-965-2489.

What is the Clearwater inspection form?

It is the city's form, required by Chapter 106, Article III of the code, for an account transfer or new account. An Illinois-licensed plumber answers eight yes or no questions about roof drains, foundation drains, sump pumps, diverter valves, sump pits, discharge hoses and backflow preventers. The form says to submit it at least 10 days before closing, and the certification is valid for one year from the inspection.

What happens if the inspection finds a problem?

The city notifies the owner and orders the building into compliance. The code sets a 30-day period for an illegal roof drain, foundation drain, sump pump or diverter valve, and 60 days where clear water enters through an under-the-basement-floor connection. A buyer can keep a sale moving by depositing a contract or accepted bid for the work, proof that funds are paid or escrowed, and a stipulation to finish within the compliance period.

Who is responsible for the sewer line between the house and the street?

Under Section 106-183 of the city code, the owner is responsible for the building sewer from the connection with the public sewer up to and including the building connection, including the part in the public right-of-way. That covers rodding for roots and repairs to a collapsed pipe. The city repairs the main sewer itself. Cleanup on private property for a backup caused by the service line's condition falls on the owner.

Who provides electric and gas, and how do I start service?

The city lists Rock Energy Co-Op as the electric and gas utility. Its Moving into Our Area page has a Start Service form, and a member service representative then calls or emails to finish the request. Questions go to 866-752-4550 on weekdays between 7:30 a.m. and 4 p.m. For an outage or a gas smell, call (608) 752-4550 or (866) 752-4550, which the cooperative says it answers 24 hours a day.

Login to My Homefinder