In Boone County, the county health department decides how a private well or septic system gets built, changed and inspected, and it does not require an inspection when a house sells. Its Environmental Health office takes calls at 815-544-2951, extension 2. If you are weighing homes for sale in Boone County, that one sentence explains why the buyer, not the county, decides whether a well and septic system get looked at before closing.
Gambino Realtors has worked in the Rockford area since 1923. This guide sticks to what the Boone County Health Department, the Boone County building office, the Illinois Department of Public Health, the Illinois General Assembly and the U.S. EPA publish. It explains the rules in plain words and says which office to call for the rest. It is not legal, tax or financial advice. For the system on a particular property, the health department and a licensed contractor have the last word.
The Environmental Division of the Boone County Department of Public Health says it has three mandated programs. They are potable water and wells, private sewage disposal, and food sanitation. The office sits at 1212 Logan Avenue, Suite 102, in Belvidere, and it is open Monday through Friday from 8:30 a.m. to 5:00 p.m.
The water side is described as the Private Water Program. Its stated goal is safe drinking water, pursued through three state laws: the Water Well and Pump Installation Contractor's Licensing Act, the Water Well Construction Code Law and the Water Well Pump Installation Code Law. In practice the county issues permits to build, change or seal a well, inspects new wells, investigates complaints about private water supplies and performs sanitary water supply surveys for real estate transfers. That last item matters for a buyer, and a later section comes back to it.
The septic side sits on top of state rules. The Illinois Department of Public Health regulates the installation of private sewage disposal systems, including septic tanks with seepage fields and systems that discharge treated effluent to the ground surface. It says about 90 local health agencies in Illinois also review plans, either under a local ordinance or as an agent of the state. The Boone County Health Department reviews septic plans and refers to its own Private Sewage Disposal Code alongside the state code. IDPH also licenses the installers and the pumpers. So a septic system in the county answers to a state code and a county code, and the county says installation must follow both.
The order of operations is the first thing to understand, because it runs against what most people expect. The county's septic page opens with an important message: before starting the process for any septic permit, well permit, building permit or zoning certificate, check with the Planning Department about the zoning. The page says plainly that a building permit cannot be issued without proper zoning. The building office for unincorporated Boone County adds that most structures need a site plan approval from the Health Department before it releases a building permit. Zoning comes first, the health department's site approval comes second, and the building permit comes last. A buyer who plans to build on rural land, or to add on to an existing country house, should know the sequence before paying for plans. The county's building permit rules for unincorporated homes are covered in Boone County Building Permits: Unincorporated Homes, and the zoning side of buying acreage is in Buying Land in Boone County: Zoning, Wells and Septic.
One small point of address. The building office warns that if an address is rejected in its online permit system, the property may not be inside its jurisdiction. The health department's well and septic role is a separate question, and the Environmental Health line is the place to ask who handles a specific address.
A new system starts in the ground. The county requires soil bores for a new installation, meaning new construction, and for replacing a septic field after a failure. A certified soil classifier performs them, and the health department keeps a list of classifiers who work in the county.
Next comes the plan. The owner or the installer submits a septic plan drawn to scale that shows the proposed home or building locations. It travels with an elevation profile, a septic checklist, a waste-stream information sheet and a maintenance agreement. Any request to vary from state or county code has to be made in a letter before approval. The county says review takes about five to ten business days after it receives the plan, and fees are paid when the plan goes in. If the plan is approved, the septic and well permits are issued to the property owner, and copies go to the contractors.
Neither the septic work nor the well drilling can start until those permits exist. The same permits have to be in place before the county building office will issue a building permit. That ties the three together. A lot with an approved septic plan and an approved well application is a lot that can move to a building permit. A lot without them cannot.
Installation has its own rules. The installer must hold an Illinois license and a Boone County license, and the system has to be built to the IDPH code and the county code. The county must be told 48 hours before work begins, and it gives the installer a confirmation number that is quoted when the final inspection is requested. The rule most worth remembering is the shortest: no part of a private sewage system may be covered or hidden until the health officer has inspected and approved it.
The county also licenses the people who do the work. A state-licensed installer or pumper must hold a Boone County Health Department license too, which is good for one year, and the county says no additional testing is required to get it. A contractor who installs or pumps without the county license faces an added fee and possible discipline. For a buyer, the practical use of this is a question for any contractor quoted on a repair: is the county license current?
Two special cases show up on the county's page. A system that uses an aerobic treatment unit and takes a smaller field, as the county code allows, needs an Operator's Permit, and the owner signs an agreement about its ongoing requirements before the septic permit is issued. The agreement spells out ongoing requirements, so ask about it if a house has such a unit. And an owner who wants to install a system personally, without a license, pays for two additional compliance inspections, and the county offers owner-installer education by appointment, paid hourly in advance.
A well follows the same logic as a septic system, with its own paperwork. Anyone who plans to construct, modify, deepen, replace or seal a well needs a permit from the county health department before the work starts. For a new, changed or replacement well, a to-scale site plan has to meet Section 920.130 of the Illinois Water Well Construction Code. The county has to be told 48 hours before work begins, and the application is emailed to the department.
Sealing deserves its own paragraph because it catches buyers off guard. The state code requires the owner of a well to see that it is sealed within 30 days after it is abandoned, which means it no longer supplies water or has fallen into such disrepair that it could carry contaminants down into an aquifer. A licensed water well driller must do the work. The code makes one exception: a person without a license may seal a well on land they own or lease and use for farming or as their home, if they file a request and a permit application first, and the county inspects every homeowner well sealing. The state health department explains why it cares. Open or poorly sealed old wells are a fall hazard, and they also give surface water, farm runoff and sewage effluent a direct path to groundwater. Under the Groundwater Protection Act, if an abandoned well contaminates a neighbor's drinking water well, the owner of the abandoned well is responsible for providing the neighbor a safe supply.
The IDPH puts the scale in perspective. It estimates 400,000 private water wells in Illinois serve about 1.3 million people. Wells get abandoned when they are replaced, and when a home connects to a public water system. The same logic applies to old septic tanks, dry wells and cisterns. The county says unused ones must be properly abandoned, and a record of the abandonment must be sent to its office.
IDPH requires every new well to be tested before the water is used. Boone County sends a letter to the new homeowner after the well driller files the construction report, then sets an appointment and offers education on the well and the septic system. The first sample is paid for through the permit application. The homeowner receives copies of the septic layout and the well construction report. If the analysis is satisfactory, the owner may use the water. If it is not, the county sends a chlorination procedure and the owner has to retest until the result is satisfactory, with a fee for retesting.
That sequence gives a buyer of a newer house two documents worth asking for: the well construction report and the first water analysis. The county page confirms the owner receives both.
For wells already in service, the state recommends a sample once a year and again after any repair. The U.S. EPA gives a similar rule and lists the four measurements it wants checked every year: total coliform bacteria, nitrates, total dissolved solids and pH. It adds that a well should be tested right away if flooding, land disturbance or new construction has changed conditions nearby, if any part of the well system was replaced or repaired, or if the water's odor, color or taste changes. The county's standard test covers coliform bacteria and nitrates, and other tests can be added one at a time. Samples have to be collected after 10:00 a.m. and brought in before 4:00 p.m. on a sample collection day, so a call to the office comes before the drive.
Collection is a procedure, and the county spells it out. Use the faucet closest to where the supply line enters the house, preferably one that bypasses any treatment device, and take off the aerator. Run the water two to three minutes, shut it off, clean the faucet with alcohol, then turn it back on to a steady stream. Fill the bottle to the top line without touching the inside of the bottle or lid. Note the time and the faucet, and keep the sample on ice or in the refrigerator until it is delivered. A department inspector can collect the sample by appointment instead.
The numbers on the county page are blunt. The standard for coliform bacteria in well water is zero. The EPA standard for nitrate is 10 milligrams per liter as nitrogen. A positive coliform result means the water is considered unsafe to drink, and the county advises bottled water or a rolling boil of three minutes for cooking and drinking until a satisfactory result comes back. Boiling does not help with nitrate, since it concentrates the nitrate instead of removing it. The county says reverse osmosis units installed in the home may reduce nitrate.
A bad bacteria result has a defined path. The owner inspects the wellhead using the county's self-inspection checklist, fixes anything wrong, and then either resamples or chlorinates and then resamples. The owner who lives on site can chlorinate, or an Illinois licensed well driller or pump installer can. The county lists causes ranging from a well that sat unused, to a poor sampling technique, to a deficiency at the wellhead. It also states the stakes beyond one household: a contaminated well could compromise the aquifer that serves neighboring wells, which is why the county treats it as a public health issue.
The county's page gives a buyer a list that can be checked with eyes alone. A pit that holds a well should be structurally sound and watertight. The casing should rise at least 12 inches above the pit or basement floor. There should be a well seal and a watertight manhole cover. If any of those is missing, the county says the pit is not compliant with the state code and may present a health threat, and a flooded pit can submerge the wellhead.
Outdoors, the code asks for 8 inches of clearance between the ground and the well cap, and it says not to bury a well or to create a bowl or depression around it. The county adds that contaminants can enter through an opening in the cap, a crack in the casing, or back-siphoning from plumbing fixtures. It also says that any time a well is opened for service, it should be chlorinated.
Start with what the county does not do. Its real estate inspections page says well and septic evaluations for a real estate transaction are not required by the Boone County Department of Public Health. They may be required by a lender or by the contract. The county adds that an inspection is a good idea for liability purposes and to prevent unexpected expenses from well and septic repairs. So the first confirmation is not a county step at all. Read the purchase contract and ask the lender whether either one requires an evaluation. If neither does, the choice to order one belongs to the buyer.
If the buyer orders one from the county, the process is simple. The department takes a Real Estate Inspection Request form by email or a phone call to the Environmental Health line, then contacts the buyer to schedule and arrange payment. The department's own description of its water program includes sanitary water supply surveys for property transfers. The county's pages do not give turnaround times for these requests, so a buyer with a tight closing date should call early and ask. They also do not say what the inspection results can or cannot do to a sale, so the contract language and the buyer's attorney matter there.
The second confirmation is the seller's disclosure. Illinois requires a seller of residential property to complete a Residential Real Property Disclosure Report. The printed form in the statute asks the seller whether they are aware of material defects in the well or well equipment, unsafe conditions in the drinking water, and material defects in the septic, sanitary sewer or other disposal system. Those are three separate lines. The form is plain about its limits: the disclosure is not a substitute for any inspection or warranty, and it is not a warranty by the seller. The report itself is covered in Illinois Seller Disclosure Report in Rockford, and what a general inspector does and does not cover in Rockford Home Inspections: What the Inspector Checks.
The third confirmation is paper. Because the county issues permits and keeps construction reports, a buyer can ask the seller for the septic layout, the well construction report, the most recent water analysis, and any record of pumping. The county recommends pumping a septic tank every two to three years, or as an experienced pumper advises, so a pumping history is a fair thing to ask about. The county issues the permits and receives the well construction reports, so the Environmental Health office is the place to ask what it has on file for an address. Its pages do not say how to request those records, so ask the office.
The fourth confirmation is the ground. A few things can be seen at a showing. A driveway or parking pad laid across it is worth a question. Raw sewage or effluent on the surface of the ground is called a public health hazard on the county page, and the state code prohibits discharge of raw or improperly treated sewage to the ground surface, to farm tiles, or to streams, ponds and other water. The state definition of improperly treated sewage includes sewage that comes directly from a septic tank or building sewer.
The fifth confirmation concerns the future. A buyer who wants a pool, an addition, a garage, or a second dwelling should ask before closing whether the footprint conflicts with the septic field. A repair of a failed system follows the same steps as a new one. It needs soil bores and a to-scale site plan showing the old system, the well and the wells on adjacent lots. Picture a simple case. A buyer falls for a farmhouse with a big back lawn and plans a pool. The pool location sits over the old field. Before the offer, a call to Environmental Health and a look at the file for the address could show where the field runs. After the closing, the same discovery means a permit, soil bores and a redesigned layout before a shovel goes in.
A last point is about the lender. The county notes that lenders may require evaluations. It does not describe any specific loan program's requirements, and this guide does not either. Ask the loan officer early, because a requirement found two days before closing is a problem that a requirement found at the offer is not.
Boone County regulates the building, changing and sealing of private wells and septic systems through its health department, but it does not inspect them when a house sells. That job is left to the buyer, the lender and the contract. The sensible habit is to treat both systems as a separate item from the house: ask for the permits, the construction report, the water test and the pumping history, order the county evaluation if neither the lender nor the contract has, and check the wellhead and the septic field yourself at the showing. Zoning, the health department, then the building permit is the order for anything new. If you are narrowing down homes for sale in Boone County, put the well and septic questions on the list before the first offer, and call 815-544-2951, extension 2, for the facts on a specific address. The wider set of Gambino guides lives in the Illinois Real Estate Guide.
That is the rule set in one place. The questions below come up most when someone is looking at a house on its own water and septic.
No. The Boone County Health Department states on its real estate inspections page that well and septic evaluations for a real estate transaction are not required by the department. They can be required by a lender or by the purchase contract. The department also calls an inspection a good idea for liability purposes and to prevent unexpected repair expenses. To request one, email the Real Estate Inspection Request form or call Environmental Health at 815-544-2951, extension 2. Read the contract and ask the lender first, because either one may already require it.
Zoning comes first. The county says to check with the Planning Department before starting any septic, well, building or zoning permit process, because a building permit cannot be issued without proper zoning. For septic, the county requires soil bores for new installations, a scale plan with an elevation profile, a checklist, a waste-stream sheet and a maintenance agreement. The septic and well permits must be issued before installation, drilling or a county building permit. The county must also get 48 hours' notice before work starts.
The installer must hold an Illinois license and a Boone County license, and the same goes for septic pumpers. The county license requires a copy of the state license and a fee, with no extra testing, and it lasts one year from the date it is issued. Working without the county license brings an added fee and possible discipline. An unlicensed homeowner may install a system, but pays for two extra compliance inspections. Before hiring anyone for a repair, ask whether the county license is current.
The Illinois Department of Public Health recommends a sample once a year and after any repair to the well. The U.S. EPA also lists total dissolved solids and pH in its annual checks, and says to test right away after flooding, nearby construction, a repair or a change in taste, color or odor. The county's standard test covers coliform bacteria and nitrates, with other tests available one at a time. You pick up a sterile bottle and instructions from the health department, then bring the sample in on a collection day, after 10:00 a.m. and before 4:00 p.m.
The county considers the water unsafe to drink. It advises bottled water, or a rolling boil of three minutes for cooking and drinking, until a satisfactory result comes back. The owner then inspects the wellhead with the county checklist, fixes any problem, and either resamples or chlorinates and then resamples. After the chlorine is flushed out, at least seven to ten days must pass before the resample. The owner who lives on site can chlorinate, or a licensed well driller or pump installer can. Boiling does not remove nitrate, it concentrates it.
Not under the county and state rules. The Illinois Water Well Construction Code requires a well to be sealed within 30 days after it is abandoned. A licensed driller does the work, or an owner may seal one on land used for farming or as a home, with a permit and a county inspection. Unused septic tanks, dry wells and cisterns must be properly abandoned, and a record of the abandonment must be sent to the health department. If you are buying, ask the seller whether any old well or tank is on the property.
It can. The county says an addition, a pool or another structure that reaches into the area where the existing septic field sits, or that needs extra septic lines, calls for a septic permit. Repairs need soil bores and a scale site plan showing the old system, the well and the wells on adjacent lots. Ask Environmental Health where the field sits before you plan any outdoor project.