Be In The Know

rss logo RSS Feed
Buying | 65 Posts
Real Estate News | 43 Posts
Selling | 45 Posts
October
13

About 73.5 percent of the housing units in Cherry Valley were built in 1990 or later, and the Census Bureau puts the median year a structure was built at 1996. Only about 19.6 percent date from before 1980. Those two numbers separate the rules that apply to the 1990-and-later majority from the ones that apply only to the older fifth.

If you are comparing homes for sale in Cherry Valley, the year built on the listing is the place to start. This guide uses the American Community Survey estimates for 2019 to 2023, the Winnebago County Building Division's own handouts, the Illinois seller disclosure form and federal rules that depend on a construction date. It describes houses and rules, not people. Gambino Realtors has been in business in the Rockford area since 1923.

What The Census Numbers Show By Decade

The Census Bureau's Table DP04 for the Village of Cherry Valley counts 1,339 housing units. This is a survey estimate, and the margin of error on the total is plus or minus 226. Every figure below carries its own margin, so read the percentages as a shape and not as an exact tally of houses.

Here is the shape, from newest to oldest. The estimate for 2020 or later is 63 units, or 4.7 percent. The estimate for 2010 to 2019 is zero, with a margin of plus or minus 12. The 2000s add 436 units, or 32.6 percent. The 1990s add 485, or 36.2 percent. The 1980s add 93, or 6.9 percent. The 1970s add 40, or 3.0 percent, and the 1960s add 39, or 2.9 percent. The 1950s add 63, or 4.7 percent, and the 1940s add 25, or 1.9 percent. Units built in 1939 or earlier come to 95, or 7.1 percent.

Those ten groups add up to the 1,339 total, and a few sums are worth having in hand. Built in 1990 or later is 984 units, or 73.5 percent. Built from 2000 on is 499 units, or 37.3 percent. The 1980s and 1990s together come to 578 units, or 43.2 percent. Everything built before 1990 is 355 units, or 26.5 percent, and everything built before 1980 is 262 units, or 19.6 percent. Before 1960 the count is 183 units, or 13.7 percent.

One detail stands out in the older end of the table. The 1939-or-earlier group, at 95 units, is larger than the 1940s, 1950s, 1960s and 1970s groups taken one at a time. The oldest group is therefore the single largest block of pre-1980 units, even though the whole pre-1980 stock is about a fifth of the total.

Be careful with the small groups. The 1970s estimate is 40 with a margin of plus or minus 29. The 1960s estimate is 39 with a margin of plus or minus 36. The 1940s estimate is 25 with a margin of plus or minus 22. A number with a margin that large says a handful of such houses exist. It does not say there are exactly that many. The same warning covers the zero for the 2010s. The survey produced that estimate for that group, and the margin is small, but the table does not explain it, and neither does this guide. It is one more reason to read the year on a specific listing and not to infer it from a decade count.

The Census Bureau also publishes the median year built for the village, which is 1996, with a margin of plus or minus 3. A median splits the housing in half. Half of the structures were built in 1996 or earlier and half in 1996 or later.

The same table describes the buildings. Of the 1,339 units, 851 are one-unit detached houses, or 63.6 percent. Another 181 are one-unit attached, or 13.5 percent. Buildings with two or more units add up to 307, or 22.9 percent. The estimate for mobile homes is zero, with a margin of plus or minus 12.

The table also covers rooms. The median is 6.4 rooms per unit. For bedrooms, 376 units have two, or 28.1 percent, 551 have three, or 41.2 percent, 277 have four, or 20.7 percent, and 66 have five or more, or 4.9 percent. None of that tells you the condition of a house. The year built is the first fact on a listing that points to which dated rules apply.

What Each Era Means For An Inspection

An inspection report does not change by era, because the Illinois disclosure form asks the seller about the same list of systems for every house. What changes is which dated rule applies to the paperwork, and which questions you should put to the seller before the inspection happens. Take the groups in turn.

Built before 1978. The census groups do not split at 1978, so the pre-1980 count of 262 units is the closest figure available. The federal lead-based paint disclosure rule applies to most housing built before 1978. EPA's page explains the cutoff plainly. The Consumer Product Safety Commission banned residential lead-based paint in 1978, so the rule does not cover housing built after 1977.

For a covered house, the rule sets out what the seller and the agents must do before a contract is signed. They disclose any known information about lead-based paint and lead-based paint hazards. They provide the available records and reports. They give the buyer a copy of the pamphlet "Protect Your Family From Lead in Your Home," and the contract carries a Lead Warning Statement. The seller must also give the buyer a 10-day period to have the paint inspected or assessed for lead-based paint hazards. That window is the reason to know the build year early. A buyer who learns on day eight that the house predates 1978 has less room than one who knew at the first showing.

The rule has exemptions. Housing in which the painted surfaces were tested by a certified lead-based inspector or risk assessor and found free of lead-based paint is exempt, and so are foreclosure sales. Our guide to the Illinois seller disclosure report covers how that paperwork fits together.

The Illinois disclosure form asks about the same materials for every house. Item 16 asks about asbestos. Item 17 asks about lead paint, lead water pipes, lead plumbing pipes and lead in the soil. Item 21 asks about underground fuel storage tanks. For a house built before 1978, read those lines alongside the federal lead disclosure.

EPA's asbestos page is the source for what to look for, and it gives no construction-year cutoff. It lists where asbestos has been used in building materials. The list includes attic and wall insulation that contains vermiculite, vinyl floor tiles and the backing on vinyl sheet flooring, roofing and siding shingles, textured paint and patching compounds on walls and ceilings, and walls and floors around wood-burning stoves. It also lists hot water and steam pipes coated with asbestos and oil and coal furnaces with asbestos-insulated door gaskets. EPA adds that exposure may occur only when the material is disturbed or damaged. For a buyer, the question matters when a renovation plan would disturb one of those materials, so ask before the work is planned.

Built from 1980 through 1999. This is 578 units, or 43.2 percent, and it is the largest block in the table once the 1990s are counted with the 1980s. No federal disclosure rule is tied to these years. The lead rule has already ended, and the asbestos and radon questions are asked of every house. So the paperwork for this group is the standard Illinois disclosure form and whatever records the seller has.

That makes the seller's records the point. The form states that the seller answers from actual knowledge, without any specific investigation or inquiry, and that the statements are not warranties. Ask when each system was last replaced and ask to see the papers.

Built from 2000 on. This group is 499 units, or 37.3 percent. The county's handouts are the useful reference here, because they describe how foundations and basements are supposed to be built and what the Building Division looks for.

The footings handout cites the 2003 edition of the International Residential Code, section R403. It says exterior walls must be supported on continuous solid or fully grouted masonry or concrete footings, wood foundations or another approved structural system. It adds that footings must sit on undisturbed natural soil or engineered fill.

The drainage handout, section R405, requires drains around concrete or masonry foundations that retain earth and enclose habitable or usable space below grade. The drain has to discharge by gravity or by mechanical means into an approved drainage system. There is one exception. A drain is not required when the foundation sits on well-drained ground or on sand and gravel mixture soils, which the handout calls Group 1 soils. For a buyer, the point is that the county's handout expects a drain around a below-grade foundation unless the soil is Group 1.

The escape-opening handout, section R310, matters when a basement has been finished. Basements with habitable space and every sleeping room need at least one openable emergency escape and rescue opening. Where a basement contains sleeping rooms, an opening is required in each one. The sill can be no higher than 44 inches above the floor. The net clear opening must be at least 5.7 square feet, or 5 square feet at the grade floor, at least 24 inches high and at least 20 inches wide, and it must work from inside without keys or tools. A window well must be at least 9 square feet. If a listing counts a basement room as a bedroom, ask whether that room has an opening that meets those numbers and whether the finishing was permitted.

The handouts cite the 2003 edition, and the county's Codes and Ordinances page lists newer ones. It states that as of April 1, 2016, the Building Division follows the 2015 International Building Code, the 2015 International Residential Code, the 2014 National Electric Code, the 2015 International Fire Code, the 2015 International Fuel Gas Code, the 2015 International Mechanical Code and the 2014 Illinois State Plumbing Code. The handouts do not say when the county first enforced each rule, so a buyer who needs to know which edition applied to a particular house should ask the Building Division at 815-319-4350.

Built 2020 or later. The estimate is 63 units. The village's permit application carries a notice specific to this group. All new subdivision homes must comply with elevations established within the approved subsidiary drainage plat. That plat is the document to ask about on a new subdivision home.

Water, Sewer, Heating And The Paper Trail

Several parts of a house do not follow the decade it was built in. The census table and the village's own reports speak to a few of them.

Start with water. The village's 2025 water quality report states that the source of Cherry Valley's drinking water is ground water. It also states that the village water system has no lead service lines. The system has built a service line material inventory, and the report says to email water@cherryvalley.org for a copy. That answers one of the questions raised by the lead item on the disclosure form, which also lists lead water pipes. The village report speaks to the public service lines. Pipes inside a house are a separate matter, and the form is where the seller addresses them.

Next is sewer. Four Rivers Sanitation Authority lists Cherry Valley among the communities it serves. The County Health Department also covers private wells and septic systems. It says you most likely have a well if the water line has no meter and you receive no water bill, and most likely a septic system if you receive no wastewater bill. Its advice is practical. Test a well once a year for coliform bacteria, nitrates and nitrites. Keep the well casing at least 8 inches above ground. To find a septic system, request the "as built" drawing from the local health department, look for inspection caps, lids or manhole covers, or hire a service provider. The department's list ends with "Ask your realtor or seller." The disclosure form has separate lines for the well, for drinking water and for the septic or sanitary sewer system, so a house on a private system needs those answered in writing.

Heating is where the census table is unusually clear. Of the 1,293 occupied units, 1,192 heat with utility gas, or 92.2 percent. Another 78 use electricity, or 6.0 percent, and 23 report that no fuel is used. The estimates for bottled or tank gas, fuel oil, coal, wood and solar are all zero. If a listing mentions an oil tank or a wood stove, the disclosure form has a line for underground fuel storage tanks and another for the fireplace or woodburning stove.

Radon does not follow the decade either. IEMA states that radon is a radioactive gas from the decay of naturally occurring uranium in soil, and that you cannot see, smell or taste it. The Illinois Department of Public Health explains that it moves through small spaces in a foundation, including floor drains, sump pits, crawl spaces, cracks and gaps around pipes and wires. It also says the foundation style makes no difference and that lower levels such as basements tend to have higher measured levels. IEMA's own map page says all homes should be tested regardless of geographic location. Our guide to radon testing in Rockford-area homes sets out the real-estate testing steps.

The last piece is the paper trail, and it is where the era of a house meets the work done since. The village says a permit is needed for decks, fences, garages, accessory buildings, cement slabs, in-ground pools and room additions as well as for any new home. The village form says a building permit for the project is obtained from the Winnebago County Building Department at 404 Elm Street in Rockford. The county Building Division services the Village of Cherry Valley by name. So the permit history of a house sits with two offices, and a deck or a finished basement may have a record with one or both of them. Our guide to Cherry Valley permits for fences, sheds, pools and decks explains how the village process works.

Item 23 on the disclosure form asks whether the seller has received notice of a violation of local, state or federal laws that has not been corrected. That is a narrow question. Ask the seller what was added, then ask the offices above. Flood risk is a separate topic with its own rules, covered in our guide to Cherry Valley flood zones.

One more era note. The estimate for mobile homes in the village is zero. If one is listed, the federal program that set construction standards for manufactured housing began on June 15, 1976. HUD's own history gives that date.

Bottom Line

Cherry Valley's housing is recent by the numbers. Nearly three quarters of its units date from 1990 or later, the median year built is 1996, and about one in five units predates 1980. The decade on a listing tells you which paperwork applies. Before 1978, the federal lead rule and its 10-day window apply. From 1980 through 1999, you rely on the seller's records and the standard disclosure form. From 2000 on, the county's footing, drainage and escape-opening handouts describe what the Building Division expects, and the village's drainage plat governs new subdivisions.

Three questions apply to every house, whatever its age. What has been replaced, and where are the papers? Was the work permitted, and which office holds the record? Has the house been tested for radon? Bring those to the first showing and you will have the answers when the inspection contingency is running.

Start with the homes for sale in Cherry Valley and read the year built before the photos. For the steps that follow once you are under contract, our guide to what a Rockford home inspector checks covers the inspection itself, and the same list applies to a Cherry Valley address.

These are estimates and published rules, not legal or tax advice. The Winnebago County Building Division, the village hall and a licensed inspector confirm the facts for any one address.

That is the shape of it. A few quick answers to what buyers ask about a house's age are below.

Frequently Asked Questions

What share of Cherry Valley homes were built before 1980?

The Census Bureau's 2019 to 2023 estimate is about 262 of 1,339 housing units, or 19.6 percent. The estimate is a survey figure, and the total carries a margin of plus or minus 226. The groups that make up the pre-1980 figure are small, so treat it as a rough size and not an exact count. The listing for a specific house is the place to confirm its year built.

Does the federal lead paint rule apply to every older Cherry Valley house?

It applies to most housing built before 1978. EPA lists exceptions, including housing built after 1977, housing tested by a certified inspector or risk assessor and found free of lead-based paint, and foreclosure sales. For a covered sale, the seller discloses known information, provides available records, gives the buyer the EPA pamphlet, and allows a 10-day period for a paint inspection or risk assessment.

Does a basement bedroom need a window?

The county's handout says every sleeping room, including one in a basement, needs an openable emergency escape and rescue opening. The sill can be no higher than 44 inches above the floor. The net clear opening must be at least 5.7 square feet, or 5 at the grade floor, with a height of at least 24 inches and a width of at least 20 inches. It must open from inside without keys or tools.

Which building codes does Winnebago County follow?

The county's Codes and Ordinances page says that as of April 1, 2016 the Building Division follows the 2015 International Building Code, the 2015 International Residential Code, the 2014 National Electric Code, the 2015 International Fire Code, the 2015 International Fuel Gas Code, the 2015 International Mechanical Code and the 2014 Illinois State Plumbing Code. Confirm current editions with the Building Division at 815-319-4350.

Does the village water system have lead service lines?

The Village of Cherry Valley's 2025 water quality report states that the village water services no lead service lines. The system has a service line material inventory, and the report says to email water@cherryvalley.org for a copy. The report covers the village system. Pipes inside a particular house are a separate question, and the seller's disclosure form has a line for lead water pipes and lead plumbing pipes.

Do I need a radon test if the house is new?

IEMA's map page says all homes should be tested regardless of geographic location. The Illinois Department of Public Health says radon enters through small spaces in a foundation, that the foundation style makes no difference and that basements tend to have higher measured levels. IEMA-OHS recommends professional testing in real estate transactions, and the seller's disclosure form has a line asking about unsafe radon concentrations.

Who issues a building permit for a Cherry Valley house?

The village handles zoning permits and its application form states that a building permit is obtained from the Winnebago County Building Department at 404 Elm Street in Rockford, phone 815-319-4350. The county Building Division lists the Village of Cherry Valley among the municipalities it services. For work already done on a house you are buying, ask the seller what was added and then ask both offices.

Login to My Homefinder