Chapter 150 of the Village of Roscoe's code, "Buildings and Construction," runs from Section 15-1 to Section 15-13, and not one of those sections is an inspection that is triggered by selling a home. The building inspectors who do work in Roscoe belong to Winnebago County, and Section 15-2 of the village code names them the village's appointed building officials. If you are weighing homes for sale in Roscoe, that split decides who you call, what a certificate of occupancy means, and what a seller's disclosure can and cannot tell you. Gambino Realtors has worked in the Rockford area since 1923. This guide sticks to the village code, the county's posted building pages and the Illinois disclosure statute. It is a plain explanation, not legal advice, and the village and the county confirm what applies to one address.
Start with the plain question of whether the village inspects a house before it changes hands. The published code does not say that it does. The Municode table of contents for Chapter 150 lists thirteen section numbers. They cover codes adopted, building officials, the zoning inspector, fire limits, building violations, dangerous buildings, fences, address display, sprinklers and smoke detectors, anti-monotony standards, construction entrances and urban chickens. One of the numbers, 15-11 on architectural review, was repealed on March 3, 2026. None of the rest is titled as a sale or resale inspection. That is a statement about what the chapter contains. It is not a promise that no other rule exists anywhere, so the village is the office that confirms it for a given address.
What Chapter 150 does is hand the technical work to the county. Section 15-1 adopts by reference the county's building, plumbing, electrical, heating, air conditioning and ventilation, and one- and two-family dwelling codes, along with any amendments, deletions and additions to them. The same section says the county's fee schedules apply inside the village, and that includes the fee schedule for a change of occupancy of a building that needs greater strength, exit ways or sanitary provisions. Section 15-2 then says the county building inspectors are the village's appointed building officials.
The village keeps one inspector of its own, and that person works on the zoning side. Under Section 15-3 the village's code enforcement officer is, unless someone else is appointed, the village zoning inspector. The duties include measuring the distance from lot lines to building foundations to check setbacks, and reporting violations or possible violations to the village president and the zoning administrator. That is a measuring job. It is separate from the county inspector who looks at framing, wiring and plumbing.
Two more sections matter for an existing house. Section 15-4 sets the fire limits as all the territory inside the village's corporate limits, so the fire-limits rule in Section 15-6(f) reaches every building in the village. Section 15-8 requires single-family dwellings built after September 1, 1998 to display address numbers on the outside wall facing the street, or at another location a village public safety officer approves, clearly visible from the street so emergency personnel can read them. A house older than that date is outside the sentence.
Section 15-9 covers detectors. Sprinkler systems are required in any building zoned RM for occupancy as three or more dwelling units, and approved smoke detectors are required in each dwelling unit of a building zoned RM. For carbon monoxide the section says only that detectors "shall be required pursuant to state statute," so the village code points out of itself and to the state law for that item. Section 15-10, the anti-monotony standards, applies to construction of new single-family detached dwellings after the ordinance took effect, so it is a new-construction rule and not a standard an older house is measured against.
One more piece of the chapter is easy to overlook. The village adopts county codes "and any amendments" to them, so the text a Roscoe house is held to is the county's text. The county's own Building Division page says it services the villages of Cherry Valley, Durand, New Milford, Rockton and Roscoe, the City of South Beloit and unincorporated Winnebago County, and it states its mission as insuring health, safety and welfare in buildings people live in, work in and visit. If you already read the guide on which rules apply to a Roscoe home, this is the building-code side of that same line.
The Village of Roscoe's zoning ordinance, adopted March 2, 2021, says when one is required. Under Section 155.15.11 a certificate issued by the Zoning Administrator is required for occupancy and use of a building thereafter erected or enlarged, for a change in use of an existing building, for occupancy and use of vacant land, for a change in the use of land to a use of a different classification, and for any change in the use of a non-conforming use. A sale is not on that list.
The timing for a new or enlarged building is built into the zoning permit. The ordinance says the application for the certificate is made at the same time as the application for the zoning permit, and that the certificate is acted on after a written request once the building or enlargement is finished in conformance with the ordinance. While construction or required alterations are being completed, the Zoning Administrator can issue a temporary certificate for not more than six months. It can be renewed. Each certificate states that the building or use complies with the chapter.
The village's zoning permit page ties the two documents together in one sentence. A zoning permit is required before any building permit may be issued or any structure or site used, and a certificate of occupancy required by the village building code is issued only for a structure that conforms with the zoning permit. The page lists what needs a zoning permit: an alteration or addition, a swimming pool, a shed, garage or accessory structure, a deck, a fence, generators, ground mounted solar panels, a new home, and a new industrial or commercial building. An application needs to be signed by the owner and the applicant, with a site plan showing the location and dimensions of the proposed structure, its distance from the lot lines and any existing buildings.
The ordinance spells out the order of the approvals. Winnebago County will not issue a building permit for a structure unless it conforms to an approved zoning permit or a special use permit has been issued. The county will not issue a certificate of occupancy until a certificate of zoning compliance has been issued. A certificate of zoning compliance expires twelve months after issuance if no building permit has been issued, and it expires when the building permit expires.
For a buyer of an existing house, one sentence in that section matters directly. The ordinance says a record of all certificates of occupancy is kept on file in the office of the Zoning Administrator, and a copy shall be forwarded, on request, to any person having a proprietary or tenancy interest in the building or land affected. That is the document trail the village itself describes. If a house had an addition, a new deck or a finished space built under a permit, the zoning file and the county permit file are where that history sits. The 2021 text may not be today's text, because Municode marks a number of Chapter 155 sections as modified since then, and the village's current web pages differ from the PDF in places. Ask the village for the version in force.
The wording of the certificate is narrow. Each one states that the building or use complies with the zoning chapter. The last section of this guide covers the Illinois disclosure form and the buyer's own inspection, which sit beside the village process.
When work is done on an existing Roscoe house under a permit, the process is the county's. The county's permits page lists a combined commercial and residential building permit application, a zoning clearance application, an inspection request form and the building fee schedule. It also posts three short sheets on how inspections work, and they are worth reading because they show what an inspector looks for. Their revision dates are February 2015 and March 2007, so treat them as the county's published practice and not as a fresh statement of today's staffing or fees. The page itself says fees are subject to change by County Board action and asks you to call to verify them.
On timing, the county sheet states that permits issued in Winnebago County are valid for one year. A permit becomes invalid unless the work starts within 180 days after it is issued, or if the work is suspended or abandoned for 180 days after it begins. The building official can grant written extensions of not more than 180 days each, and the request has to be in writing with justifiable cause shown. The same sheet puts the duty to ask for an inspection on the permit holder or the permit holder's agent, together with the duty to provide access. Work does not go past a given inspection without approval, and a portion that fails is not to be covered or concealed until the building official authorizes it. For anyone buying a house that had work done, a permit that lapsed is a fact worth asking about, since the sheet says a permit goes invalid under those conditions.
The inspections sheet is based on the 2003 International Residential Code and lists the stages. A foundation inspection comes before concrete is placed. The rough plumbing, mechanical, gas and electrical inspection comes before anything is covered and before framing. Frame and masonry are inspected after the roof, masonry, framing, fire stopping, draft stopping and bracing are in place. A back-fill inspection comes after damp proofing and drain tile are installed and before back-filling. The final inspection is made after the permitted work is complete and before occupancy. In flood-prone areas the sheet also calls for documentation, prepared and sealed by a registered design professional, of the elevation of the lowest floor.
The sheet adds the rules of the process. Inspectors have three working days from the day of a request. A request called in before 9:00 a.m. is inspected that day if the workload allows. If the inspector arrives and the work is incomplete, that is an automatic fail, and so is finished work that does not meet minimum code. Written corrections are left on site, and a re-inspection can then be requested. Inspectors make up to two visits for a specific inspection, and after a second failure a re-inspection fee has to be paid before further inspections happen. A permit must also be posted and visible, because under the 2016 county ordinance no inspection of any kind is performed unless a building permit for that address is posted.
The final inspection sheet is titled as the minimum requirements for issuance of a certificate of occupancy, and it lists fifteen items. The roof is complete, the outside walls weather tight and the windows and doors in. Electrical wiring is run with plugs, switches and face plates on. The plumbing waste, drain, vent and water supply systems are complete. Insulation and sheetrock are finished, and the walls, floors and ceilings of bathrooms and kitchens are washable. The kitchen has a sink and provision for a stove. The bath is complete with a toilet, lavatory and a tub or shower. The water heater is installed, and so is the furnace with thermostats. Stairs and railings are complete, and any deck on the permit has its guardrails and stairs. Gutters, downspouts and erosion control are in. Smoke and carbon monoxide detectors are installed and ready to function. Zoning, Planning, Environmental Health, Highway, grading and Fire District requirements are met and any hold on the building permit is removed.
The sheet is titled for issuance of a certificate of occupancy. It does not say it applies to a resale, so read it as a picture of what a finished house had to show on the day it was inspected.
The county replaced its 2003 residential code, which it adopted on April 14, 2005, with the 2015 International Residential Code for One- and Two-Family Dwellings under ordinance 2016 CO 034, pages dated March 10, 2016. The ordinance says the county worked with the City of Rockford and about 25 communities and six counties in northwest Illinois on a Regional Building Code. The county's Codes and Ordinances page lists that 2016 set and no later building code ordinance. The posted pages do not say whether a newer edition has been adopted since, so ask the Building Division which edition applies to a permit you are asking about.
Some of the amendments in that ordinance touch parts of a house a buyer can see:
These are amendments to the code the county adopted, and the county's Building Division is the office that says how any one of them applies to an existing house. The ordinance also sets penalties. It says a violation is punishable by a fine of not more than one thousand dollars per offense, each day a separate offense, and that continuing work after a stop-work order carries the same fine. The notice of violation has to go to the person responsible for the construction, alteration or occupancy of the building. A person can appeal a decision of the building official to the county's Building/Mechanical Board of Appeals by filing within 20 days after notice. The board has seven members, it takes four concurring votes to modify or reverse a decision, and it has no authority to waive code requirements.
The village side has its own enforcement tool for houses in poor condition. Section 15-5 makes it unlawful to erect, enlarge, alter, repair, convert, demolish, use, occupy or maintain a building contrary to the chapter, an approved plan, a directive of the building official, a permit or certificate, or a stop-work order. It lets the state's attorney act to prevent illegal occupancy. Section 15-6 defines a dangerous building in four parts. One is a building dangerous to public health because of its condition. One is a building especially liable to fire because of faulty construction, age or lack of repair. One is a building liable to cause injury by collapse. The last is a building that, because of its condition or a lack of doors or windows, is available to and frequented by people who are not lawful occupants. A dangerous building is declared a nuisance, and it is unlawful to occupy it or let it be occupied while it stays dangerous.
The procedure is also written down. The building official files a written statement with the village clerk, and the clerk serves written notice on the owner and on any occupant by registered mail or personal service. The notice says the condition must be remedied by repair or alteration or by demolition. If the owner and the lien holders of record do not act after at least 15 days' written notice by mail, the village applies to the circuit court. The cost of repair or demolition can be recovered from the owner and becomes a lien that is superior to prior liens except taxes, provided notice of the lien is filed with the recorder within 180 days after the work. A suit to foreclose the lien has to start within three years of filing the notice. Section 15-6 also covers a building within the fire limits that has deteriorated or been damaged to the extent of 50 percent of its value, which is to be torn down, removed or rebuilt with nonflammable walls, with 20 days for the owner after a three-person board verifies the finding.
Illinois puts the buyer's protection somewhere else. The Residential Real Property Disclosure Report under 765 ILCS 77/35 includes item 23, in which a seller states whether they have received notice of a violation of local, state or federal laws or regulations relating to the property that has not been corrected. The form also states that the disclosure is not a substitute for any inspections or warranties that a buyer or seller may wish to obtain or negotiate, and that the buyer may request an inspection of the premises by a qualified professional. Gambino's guides on what a Rockford home inspector checks and on the Illinois seller disclosure report cover those two pieces.
A few practical questions follow from the rules above. Which office issued the permits on the house, the village for zoning and the county for construction. Whether a certificate of zoning compliance and a certificate of occupancy are on file for an addition, a deck or a finished space. Whether any permit lapsed under the county's 180-day and one-year rules. Whether the village has an open notice about the property. If a project is on your list after closing, Gambino's guide to Roscoe permits for fences, sheds, pools and decks covers the zoning permit side.
It gives you county inspectors who are the village's building officials, a village zoning inspector who measures setbacks, a certificate of occupancy tied to new or enlarged buildings and changes of use, and a dangerous-building procedure for houses that have fallen into disrepair. The county's posted inspection sheets show what an inspector checks at each stage, and the final-inspection list shows what a newly finished house had to meet. Nothing in those documents says a house you are touring has been checked today, so the questions are the zoning file, the county permit file and a private inspector you hire. If you are looking at homes for sale in Roscoe, the village and the county have the last word on any one parcel.
Before you go, here are the questions that tie the village code to the county's inspection pages.
The village's Chapter 150, Buildings and Construction, has section numbers 15-1 through 15-13, and none of them is titled as a sale or resale inspection. The county building inspectors are the village's appointed building officials under Section 15-2, and the county's permit pages describe inspections tied to permitted work. The village is the office that confirms whether any other rule applies to a particular address, and a buyer can still request an inspection by a qualified professional, as the Illinois disclosure report states.
The village's zoning ordinance, adopted March 2, 2021, requires a certificate issued by the Zoning Administrator for a building that is erected or enlarged, a change in use of an existing building, occupancy and use of vacant land, a change in the use of land to a different classification, and any change in a non-conforming use. A sale is not on that list. Municode marks parts of the village zoning chapter as modified since 2021, so ask the village for the version now in force.
Winnebago County. Section 15-1 of the village code adopts the county's building, plumbing, electrical, heating and ventilation, and one- and two-family dwelling codes, and Section 15-2 names the county building inspectors as the village's appointed building officials. The county Building Division lists the Village of Roscoe among the places it services. The village's own zoning inspector is the code enforcement officer, whose duties include measuring the distance from lot lines to foundations to check setbacks.
The county's permit sheet states that permits issued in Winnebago County are valid for one year. A permit also becomes invalid unless the work starts within 180 days after it is issued, or if the work is suspended or abandoned for 180 days after it begins. The building official can grant written extensions of not more than 180 days each when the request is in writing and shows justifiable cause. The sheet is dated February 2015, so call the Building Division to confirm current practice.
The county's final inspection sheet, revised March 2007, lists fifteen minimum requirements for a certificate of occupancy. They include a completed roof with weather tight walls, installed windows and doors, finished wiring and plumbing systems, a kitchen sink with provision for a stove, a complete bath, an installed water heater and furnace, finished stairs and railings, decks with guardrails, installed smoke and carbon monoxide detectors, and removal of any Zoning, Highway, Environmental Health or Fire District hold on the permit.
Section 15-6 of the village code declares a dangerous building a nuisance and makes it unlawful to occupy it or let it be occupied while it stays dangerous. The clerk serves written notice on the owner and any occupant, and the village can apply to the circuit court if the owner and lien holders of record do not act after at least 15 days' written notice by mail. The cost of repair or demolition becomes a lien that is superior to prior liens except taxes if notice is filed within 180 days.
The zoning ordinance says a record of all certificates of occupancy is kept on file in the office of the Zoning Administrator, and a copy is forwarded on request to a person with a proprietary or tenancy interest in the building or land. The county's Building Division and its Planning and Zoning office hold the building and zoning permit side. The Illinois disclosure report also asks the seller about uncorrected notices of violation, but the report is not a substitute for inspections.