About 49.9 percent of the housing units in South Beloit were built in 1990 or later, and the Census Bureau puts the median year a structure was built at 1990. The other half runs back through the 1980s, 1970s, 1960s, 1950s and earlier, and 45.2 percent of all units date from before 1980. That split decides which federal and state rules apply to the house you are looking at.
If you are comparing homes for sale in South Beloit, the year built on the listing is the place to start. This guide uses the American Community Survey estimates for 2019 to 2023, the Winnebago County Building Division's own handouts, the City of South Beloit's sewer inspection form, the Illinois seller disclosure form and federal rules that depend on a construction date. It describes houses and rules, not people. Gambino Realtors has been in business in the Rockford area since 1923.
The Census Bureau's Table DP04 for the City of South Beloit counts 3,256 housing units. This is a survey estimate, and the margin of error on the total is plus or minus 295. Every figure below carries its own margin, and several are wide, so read the percentages as a shape and not as an exact tally of houses.
Here is the shape, from newest to oldest. The estimate for 2020 or later is zero, with a margin of plus or minus 17. The 2010s add 64 units, or 2.0 percent. The 2000s add 846, or 26.0 percent. The 1990s add 714, or 21.9 percent. The 1980s add 161, or 4.9 percent. The 1970s add 360, or 11.1 percent, and the 1960s add 183, or 5.6 percent. The 1950s add 381, or 11.7 percent, and the 1940s add 96, or 2.9 percent. Units built in 1939 or earlier come to 451, or 13.9 percent.
Group those decades and the picture is easier to hold. The 2000s and later account for 910 units, or 27.9 percent. The two decades of the 1980s and 1990s account for 875, or 26.9 percent. Everything before 1980 comes to 1,471 units, or 45.2 percent. Before 1960 the count is 928, or 28.5 percent, and before 1950 it is 547, or 16.8 percent. Those are sums of the estimates above, so they carry margins of their own.
The 2000s estimate is 846 units with a margin of plus or minus 183, and the 1990s estimate is 714 with a margin of plus or minus 221, so the two ranges overlap. The 1950s are 381 and the 1970s are 360, each with margins above 160. The 1939-or-earlier group has a margin of plus or minus 225 on an estimate of 451. If a specific house matters to you, the county's property record and the listing are better evidence than any decade bin.
The census table also shows what these buildings are. Of the 3,256 units, 2,344 are single-family detached houses, or 72.0 percent, and 203 are single-family attached, or 6.2 percent. Buildings with two or more units add up to 528, or 16.2 percent. The estimate for mobile homes is 181 units, or 5.6 percent. The table reports zero occupied units lacking complete plumbing facilities, with a margin of plus or minus 17.
Heating is the other place where the table speaks clearly. Of 3,130 occupied units, 2,484 heat with utility gas, or 79.4 percent. Another 621 use electricity, or 19.8 percent. Wood is 19 units and no fuel used is 6. The estimates for bottled or tank gas, fuel oil, coal and solar are all zero. A listing that mentions an oil tank or a wood stove is describing something that the table counts at 19 units or zero, and the Illinois disclosure form has a separate line for underground fuel storage tanks and another for a fireplace or woodburning stove.
One caution about the bins. The Census groups split at 1980 and 1960, not at 1978. The lead paint rule, covered below, is tied to 1978. The pre-1980 count of 1,471 is the closest figure available, and it is slightly larger than the group the federal rule covers. Do not read it as a count of lead-paint houses.
An inspection report does not change by era, because the Illinois disclosure form asks the seller about the same list of systems for every house. What changes is which dated rule applies to the paperwork, and which questions to put to the seller before the inspection happens. Take the groups in turn.
Built before 1978. About 45.2 percent of South Beloit's units fall before 1980. The federal lead-based paint disclosure rule applies to most pre-1978 private housing. EPA's page explains the cutoff plainly. The Consumer Product Safety Commission banned residential lead-based paint in 1978, so the rule does not cover housing built after 1977.
For a covered house, the rule sets out what the seller and the agents must do before a contract is signed. They disclose any known information about lead-based paint and lead-based paint hazards. They provide the available records and reports. They give the buyer a copy of the pamphlet "Protect Your Family From Lead in Your Home," and the contract carries a Lead Warning Statement. The seller must also give the buyer a 10-day period to have the paint inspected or assessed for lead-based paint hazards. That window is the reason to know the build year early.
The rule has exemptions. Housing in which the painted surfaces were tested by a certified lead-based inspector or risk assessor and found free of lead-based paint is exempt, and so are foreclosure sales. Our guide to the Illinois seller disclosure report covers how the state paperwork fits together.
The Illinois form asks about the same materials for every house. Item 16 asks about asbestos. Item 17 asks about lead paint, lead water pipes, lead plumbing pipes and lead in the soil. Item 21 asks about underground fuel storage tanks. For a house built before 1978, read those lines alongside the federal lead disclosure.
EPA's asbestos page is the source for what to look for, and it gives no construction-year cutoff. It lists where asbestos has been used in building materials. The list includes attic and wall insulation that contains vermiculite, vinyl floor tiles and the backing on vinyl sheet flooring, roofing and siding shingles, textured paint and patching compounds on walls and ceilings, and walls and floors around wood-burning stoves. It also lists hot water and steam pipes coated with asbestos and oil and coal furnaces with asbestos-insulated door gaskets. EPA adds that exposure may occur only when the material is disturbed or damaged. For a buyer, the question matters when a renovation plan would disturb one of those materials, so ask before the work is planned.
Built from 1980 through 1999. This is 875 units, or 26.9 percent, and the median year built for the whole city, 1990, falls inside it. The lead rule has already ended, and the asbestos and radon questions are asked of every house. So the paperwork for this group is the standard Illinois disclosure form and whatever records the seller has.
That makes the seller's records the point. The form states that the seller answers from actual knowledge, without any specific investigation or inquiry, and that the statements are not warranties. It also says the seller has a continuing obligation to supplement the report before closing. Ask when each system was last replaced and ask to see the papers.
Built from 2000 on. This group is 910 units, or 27.9 percent.
The footings handout cites the 2003 edition of the International Residential Code, section R403. It says exterior walls must be supported on continuous solid or fully grouted masonry or concrete footings, wood foundations or another approved structural system. It adds that footings must sit on undisturbed natural soil or engineered fill, that spread footings must be at least 6 inches thick, and that exterior footings must be placed at least 12 inches below the undisturbed ground.
The drainage handout, section R405, requires drains around concrete or masonry foundations that retain earth and enclose habitable or usable space below grade. The drain has to discharge by gravity or by mechanical means into an approved drainage system. There is one exception. A drain is not required when the foundation sits on well-drained ground or on sand and gravel mixture soils, which the handout calls Group 1 soils. The county's companion drawing of the drain tile cross section, revised in September 2006, shows a frost protected footing depth of 42 inches minimum and an 8 by 16 inch minimum footing. For a buyer, the point is that the county expects a drain around a below-grade foundation unless the soil is Group 1.
The escape-opening handout, section R310, matters when a basement has been finished. Basements with habitable space and every sleeping room need at least one openable emergency escape and rescue opening. Where a basement contains sleeping rooms, an opening is required in each one. The sill can be no higher than 44 inches above the floor. The net clear opening must be at least 5.7 square feet, or 5 square feet at the grade floor, at least 24 inches high and at least 20 inches wide, and it must work from inside without keys or tools. A window well must be at least 9 square feet. If a listing counts a basement room as a bedroom, ask whether that room has an opening that meets those numbers and whether the finishing was permitted.
The handouts cite the 2003 edition, and the county's Codes and Ordinances page lists newer ones. It states that as of April 1, 2016, the Building Division follows the 2015 International Building Code, the 2015 International Residential Code, the 2014 National Electric Code, the 2015 International Fire Code, the 2015 International Fuel Gas Code, the 2015 International Mechanical Code and the 2014 Illinois State Plumbing Code. The handouts do not say when the county first enforced each rule, so a buyer who needs to know which edition applied to a particular house should ask the Building Division at 815-319-4350.
Built 2020 or later. The estimate is zero, with a margin of plus or minus 17, so the census table gives a buyer nothing to work with for this group. The 2010s add 64 units, or 2.0 percent. For any house that is new construction, the city's sewer inspection form states that all internal plumbing must be in place before certification, and it asks the same eight questions as it does for an older house.
Manufactured homes. The estimate of 181 mobile homes, or 5.6 percent, is a different kind of record, because a manufactured home is dated by a federal program and not by a local permit year. The U.S. Department of Housing and Urban Development's manufactured housing history says Congress passed the Manufactured Housing Construction and Safety Standards Act in 1974 and that the federal program commenced on June 15, 1976. A buyer looking at a manufactured home should ask the seller for the date of manufacture and for any paperwork the seller has, and should ask the city or county what a transfer of that kind requires.
Several parts of a house do not follow the decade it was built in. South Beloit has one rule that touches every sale on the city sewer system, and it is worth knowing before the first showing.
The City of South Beloit publishes a Clearwater Inspection Form for account transfers and new accounts. The form states that it is required by Chapter 106, Article III of the city's Code of Ordinances and that an Illinois-licensed plumber completes it. It asks that the form be submitted at least 10 days before closing. It is not valid without the signature and complete plumber information, and the certification is valid for one year from the date of inspection.
The form asks eight yes or no questions. Does a roof drain discharge to the sanitary sewer? Does a foundation drain? Does a storm or ground water sump pump? Does a combination storm and sanitary pump? Is there a diverter valve on the storm water sump pump discharge? Is there a sanitary sewer sump pit without a sealed bottom? Is there a flexible discharge hose on the sump pump? Are there backflow preventers, such as sanitary check valves?
This is where era matters in a practical way. The county's drainage handout describes drains around foundations that enclose habitable space below grade. The city's form asks where that foundation drain and the sump pump discharge. A house with a below-grade foundation and a sump pit has those parts to check. The form does not say which decade is more likely to have which arrangement, so the plumber's answer on the specific house is the evidence. If the answer is improper, the buyer should ask the city what it requires, using the number on the form, 815-389-3070, before closing.
A related note comes straight from the city's Public Works page. It warns that sewer backup damage may not automatically be covered by a homeowners or renters insurance policy, tells people to ask their insurance agent whether they are covered for sewer backups, and says special endorsements can be added to a policy. That line is worth a phone call before closing, whatever the build year. Our guide to moving to South Beloit: water, sewer, trash and utilities goes through the account steps in more detail.
On the water side, the city's Public Works page lists Illinois American Water as the water utility and Rock Energy Co-Op as the electric and gas utility. The disclosure form has a line for unsafe conditions in the drinking water and another for the well. A listing that shows a private well is also asking a different set of questions. The County Health Department says you most likely have a well if the water line has no meter and you get no water bill, and most likely a septic system if you get no wastewater bill. It recommends testing a well once a year for coliform bacteria, nitrates and nitrites, and keeping the well casing at least 8 inches above ground. To find a septic system, request the "as built" drawing from the local health department, look for inspection caps, lids or manhole covers, or hire a service provider. The department's list ends with "Ask your realtor or seller."
Flooding and earth movement are separate lines on the state form and do not follow the decade either. Items 2 and 4 ask about flood hazard insurance and whether the property is in a floodplain, and item 3 asks about flooding or recurring leakage in the crawl space or basement. Item 18 asks about mine subsidence, underground pits, settlement, sliding, upheaval or other earth stability defects. Our guide to South Beloit flood zones and flood rules covers the map side of that question.
Radon does not follow the decade either, with one exception for new construction. The Illinois Emergency Management Agency states that radon is a radioactive gas from the decay of naturally occurring uranium in soil, and that you cannot see, smell or taste it. The Illinois Department of Public Health explains that it moves through small spaces in a foundation, including floor drains, sump pits, crawl spaces, foundation cracks and gaps around pipes and wires. It states that the foundation makes no difference and that lower levels such as basements tend to have higher measured levels. It also reports an IEMA study in which 41 percent of homes tested in Illinois had levels above the action level of 4.0 picocuries per liter.
The agency's map page says that all homes should be tested regardless of geographic location, and it recommends professional testing in real estate transactions. The exception for new construction is that since June 2013 the Radon Resistant Construction Act has required passive radon reduction techniques during construction. The state's radon laws require that buyers be informed and that test results be disclosed, but they do not require testing or mitigation. Line 15 of the disclosure form is where the seller answers on radon.
South Beloit's housing stock splits roughly in half at 1990. The census estimates 49.9 percent from 1990 on and 45.2 percent from before 1980, with a median year built of 1990 and wide margins on the older bins. That makes the build year on a listing a prompt for three practical checks and not a verdict on the house.
For a house from before 1978, ask for the lead disclosure and use the 10-day window. For a basement that has been finished, ask whether the sleeping room has an escape opening that meets the county's numbers and whether the work was permitted. The Winnebago County Building Division at 815-319-4350 can answer which codes apply to a given address.
None of this is legal or financial advice, and it does not replace a licensed inspector, plumber or attorney. It tells you which questions to ask and which office answers them. If you want to see what is on the market now, start with the homes for sale in South Beloit, and use the Illinois Real Estate Guide to find the rest of our local guides.
Before you go, a few of the questions that come up when a buyer sees an older build year on a South Beloit listing.
The Census Bureau's 2019 to 2023 estimate puts the median year a structure was built in South Beloit at 1990, with a margin of plus or minus 9 years. The 2000s account for 846 units, or 26.0 percent, and the 1990s for 714, or 21.9 percent. Units built before 1980 come to 1,471, or 45.2 percent. These are survey estimates with margins of error, so use them as a shape and check the specific house's year on the listing.
No. EPA's Lead-Based Paint Disclosure Rule applies to most pre-1978 private housing and does not apply to housing built after 1977. It also exempts housing that a certified inspector or risk assessor tested and found free of lead-based paint, and foreclosure sales. For a covered house, the seller must give the buyer a 10-day period to conduct a paint inspection or risk assessment.
It is a city form required by Chapter 106, Article III of the City of South Beloit Code of Ordinances for an account transfer or new account. An Illinois-licensed plumber completes it. It asks eight yes or no questions about roof drains, foundation drains, sump pumps, diverter valves, sump pits, discharge hoses and backflow preventers. The city asks that it be submitted at least 10 days before closing, and the certification is valid for one year from the date of inspection.
The Winnebago County Building Division services the City of South Beloit, along with Cherry Valley, Durand, New Milford, Rockton, Roscoe and unincorporated Winnebago County. The county's Codes and Ordinances page lists the code editions it follows as of April 1, 2016, including the 2015 International Residential Code.
The county's escape-opening handout, based on section R310 of the 2003 International Residential Code, says every sleeping room and every basement with habitable space needs at least one openable emergency escape and rescue opening. The sill can be no higher than 44 inches above the floor. The net clear opening must be at least 5.7 square feet, or 5 square feet at the grade floor, at least 24 inches high and at least 20 inches wide, and it must open from inside without keys or tools.
The Illinois Emergency Management Agency says that all homes should be tested regardless of geographic location and recommends professional testing in real estate transactions. Since June 2013 the Radon Resistant Construction Act has required passive radon reduction techniques during construction of new homes, but a test is still the only way to know the level. The Illinois Department of Public Health says the foundation makes no difference and that basements tend to have higher measured levels.
No. The form under 765 ILCS 77/35 asks 24 yes or no statements about conditions the seller is aware of, such as basement or foundation defects, electrical, plumbing, radon, asbestos, lead paint and flooding. It does not ask the year built. The seller answers from actual knowledge, without any specific investigation, and the statements are not warranties. That is why a buyer pairs the form with an inspection and the seller's records.